IBIS Macromodel Task Group Meeting date: 14 April 2009 Members (asterisk for those attending): Adge Hawes, IBM Ambrish Varma, Cadence Design Systems * Anders Ekholm, Ericsson * Arpad Muranyi, Mentor Graphics Corp. Barry Katz, SiSoft * Bob Ross, Teraspeed Consulting Group * Brad Brim, Sigrity Brad Griffin, Cadence Design Systems Chris McGrath, Synopsys David Banas, Xilinx Deepak Ramaswany, Ansoft Donald Telian, consultant Doug White, Cisco Systems Eckhard Lenski, Nokia-Siemens Networks Essaid Bensoudane, ST Microelectronics * Fangyi Rao, Agilent Ganesh Narayanaswamy, ST Micro Gang Kang, Sigrity Hemant Shah, Cadence Design Systems Ian Dodd, Agilent Jerry Chuang, Xilinx Joe Abler, IBM * John Angulo, Mentor Graphics John Shields, Mentor Graphics Ken Willis, Cadence Design Systems Kumar Keshavan, Sigrity Lance Wang, Cadence Design Systems Luis Boluna, Cisco Systems * Michael Mirmak, Intel Corp. Mike LaBonte, Cisco Systems Mike Steinberger, SiSoft * Mustansir Fanaswalla, Xilinx Patrick O'Halloran, Tiburon Design Automation Paul Fernando, NCSU Pavani Jella, TI * Radek Biernacki, Agilent (EESof) * Randy Wolff, Micron Technology Ray Comeau, Cadence Design Systems Richard Mellitz, Intel Richard Ward, Texas Instruments Samuel Mertens, Ansoft Sam Chitwood, Sigrity Sanjeev Gupta, Agilent Shangli Wu, Cadence Design Systems Sid Singh, Extreme Networks Stephen Scearce, Cisco Systems * Steve Pytel, Ansoft Syed Huq, Cisco Systems Syed Sadeghi, ST Micro Ted Mido, Synopsys Terry Jernberg, Cadence Design Systems Todd Westerhoff, SiSoft Vladimir Dmitriev-Zdorov Vikas Gupta, Xilinx Vuk Borich, Agilent * Walter Katz, SiSoft Zhen Mu, Cadence Design Systems ------------------------------------------------------------------------ Opens: Arpad may not be able to call in for the meeting next week. - Michael M may be able chair, not sure Arpad asked for feedback on the meeting last week: - There may be long term but not short term connections between IBIS and CMC - Randy: We should not stall our current work - Walter: We will be done before them and can present our work to them - They can come up with equivalent elements - It must be possible to translate back and forth - Arpad: They seem to be going down the IC path currently - Brad: They seem to be looking at the language, not the content Michael M suggested setting a timeline for our open items - Walter: - IbisIS - This may be done by end of summer or early fall - Some time in June we should have a reasonable document - We need to get a few more DOC files from Synopsys - Task: Go through edited DOC file (4 wks from 4/21) - Task: Add boiler plate (why, etc...) - Task: Editorial review (couple of months ???) - Target IBIS Summit at DAC for introducing the draft (end of July) - EMD would be next - Touchstone: - Touchstone ports info (1-3 months) - Touchstone sparse matrix format (1 month) - These can be independent of us - The ad-hoc interconnect group can do it - Radek: These may be underestimating - AMI improvements - Working to solve non-LTI issues (3 months) AMI improvements (BIRD 107 caused AMI to be LTI only, 3 months) - Arpad: We need a detailed timeline for the document we are working on - Walter: It depends on feedback received - Michael M: What are the tasks? - Walter: - Need to get 1 or 2 .doc files from Synopsys - Repeat edit process on those - Need to accept/reject the changes - Add boilerplate - Mike L: We should allow time for editorial review - Randy: That could stretch out over a long time. -------------------------- Call for patent disclosure: - No one declared a patent. ------------- Review of ARs: - Todd: Write IBIS s-param BIRD - Still working on it - It may be done in 2 weeks or so - Arpad: Write parameter passing syntax proposal (BIRD draft) for *-AMS models in IBIS that is consistent with the parameter passing syntax of the AMI models - TBD - TBD: Propose a parameter passing syntax for the SPICE - [External ...] also? - TBD - Arpad: Review the documentation (annotation) in the macro libraries. - Deferred until a demand arises or we have nothing else to do ------------- New Discussion: Arpad: Can we have something ready for the DAC summit in July? - Randy: We should be able to do that - Walter: The boilerplate may not be ready - That may be important to have though - The reference manual part is simple Walter showed the IbisIS document: - Walter has worked on 4 documents from Synopsys so far - Could not find the T element in the documents we have - Most of the content has been deleted - Would prefer not to go through the deleted content during meetings - Arpad: The W element seems to be in 2 places - Walter: Yes, we have to figure out the differences - Not much was deleted from the S element - Arpad: It looks like W element still has the RLGCFILE param - We agreed to drop this - Walter: Will have to check on this - The only independent source retained was the shunt element - Arpad: CCVS vn1 has plural "sources" - Arpad: We should allow only one controlling source - Walter: Need to understand why these are needed - Mike L: What will we do about unresolved references? - Arpad: Some of these point to the same file - It may be only necessary to regenerate the references Arpad: How will the work be assigned? - If we ask people to send comments to Walter it may not be thoroughly reviewed - Walter: We do not have the general rules or SUBCKT. - We have: - Simple Linear elements - Dependent Sources - W element - S element - Mike L can look at Dependent Sources - Randy: Has read the documents and has comments Randy showed his IbisIS review comments: - Examples should be included - Walter: They take up a lot of space and were deleted - Often they used features we do not support - Can capacitors have expression parameters? - Walter: We can drop the F element - Mike L: Aren't these used for coupling in some connector models? - We will keep them - Should we support Y matrix data? - We should support whatever Touchstone supports - Improve formatting text 'str' under Touchstone - Some confusion over this - Should we support Lgnd, Rognd, Rsgnd? AR: Walter send IbisIS documents to list (with Randy's email) AR: Mike L update Dependent Sources document Not sure about logistics for the next meeting. Next meeting: 28 April 2009 12:00pm PT -----------